| Gas Pipe Sizing Calculator |
|
pipe type | |||||||||||
| gas type density | |||||||||||||
| insert your information in the yellow boxes | |||||||||||||
| KW net / Gross / M3/Hr | Number | Pipe Size | mm | ||||||||||
| kWgross | kW | 45 Form Bends |
|
||||||||||
| kWnett | kW | 90 Form Bends | Gas Rate | m3/hr | |||||||||
| m3/hr | m3/hr | 90 elbows | |||||||||||
| kWgross | kW | tee flow entering branch | Length | m | |||||||||
| kWnet | kW | tee flow exiting branch | |||||||||||
| M3/hr | m3/hr | Actual Pipe Length | Pressure Drop | mb | |||||||||
| Typical Equivilent Pipesizes For fittings | Equivilent Lengths in Meters | |||||||||||||||||||
| Form Bends: using bending machine or spring | Fittings: Compression / Soldered / Xpress etc | |||||||||||||||||||
|
|
|||||||||||||||||||
| Copper / TRAC Pipe | Low Carbon Steel | PE / MDPE | ≤ 45° | >45°- 90° | 90° elbow | Tee (Flow entering the branch) | Tee (Flow exiting the branch) | |||||||||||||
| ≤ 15mm | ≤ 1/2" | ≤ 20mm | 0.15 | 0.20 | 0.40 | 0.75 | 1.20 | |||||||||||||
| 22mm | 3/4" | 25mm | 0.20 | 0.30 | 0.60 | 1.20 | 1.80 | |||||||||||||
| 28mm | 1" | 32mm | 0.25 | 0.40 | 0.80 | 1.50 | 2.30 | |||||||||||||
| 35mm | 1 1/4" | 40mm | 0.30 | 0.50 | 1.00 | 2.00 | 3.00 | |||||||||||||
| PRESSURE LOSS FROM THE METER TO THE APPLIANCES MUST BE CALCULATED TO CONFIRM IF IT IS WITHIN THE ALLOWABLE PRESSURE DROPS 1MB FOR NATURAL GAS / 2MB FOR L.P.G. | ||||||||||||||
| STEP1. Appliances | Maximum Heat input kw net | Maximum Gas Rate | STEP 4. Add the pipework section pressure drops from the meter to each applaince | TOTAL PRESSURE DROP MB | SATISFACTORY? | |||||||||
| STEP 2. SKETCH THE PIPE WORK LAYOUT INDICATING PIPE LENGTHS AND LABELS I.E. A-B, B-C, | ||||||||||||||
| STEP 3. PIPEWORK SECTION | MAXIMUM HEAT INPUT NET | MAXIMUM FLOW RATE | ESTIMATED PIPE SIZE | PIPE LENGTH | FITTINGS | EQIVILENT LENGTH | TOTAL EQUIVILENT LENGTH | PRESSURE LOSS / METRE | PRESSURE LOSS | |||||
| YOUR LABEL | COLUMN A FROM THE TABLES | COLUMN A FROM THE TABLES | MM | METRES | TYPE | METRES FROM TABLE B | ADD PIPE LENGTH AND FITTINGS LENGTH | MBAR/M FROM TABLE A | MULTIPLY EQUIVILENT LENGTH BY PRESSURE LOSS | |||||
| 1 | ||||||||||||||
| 2 | ||||||||||||||
| 3 | ||||||||||||||
| 4 | ||||||||||||||
| 5 | ||||||||||||||
| 6 | ||||||||||||||
| 7 | ||||||||||||||